In accordance to Clause 56(1)g of the Electricity Act 1999, Cap 145, Uganda Electricity Transmission Company Limited, the holder of transmission license was designed by the Electricity Regulatory Authority to publish standardized tariffs based on avoided cost of the system for sales to the grid of electricity generated by renewable energy systems of up to a maximum capacity of 20MW.
The published feed-in-tariffs by the Uganda Electricity Transmission Company Limited, in consultation with the Electricity Regulatory Authority are shown in the table below: