Feed - in -Tariffs for Hydropower systems and bagasse up to a maximum capacity of twenty megawatts (20MW)

 

 

In accordance to Clause 56(1)g  of the Electricity Act 1999, Cap 145, Uganda Electricity Transmission Company Limited, the holder of transmission license was designed by the Electricity Regulatory Authority to publish standardized tariffs based on avoided cost of the system for sales to the grid of electricity generated by renewable energy systems of up to a maximum capacity of 20MW.

The published feed-in-tariffs by the Uganda Electricity Transmission Company Limited, in consultation with the Electricity Regulatory Authority are shown in the table below:

 

 

 

Feed - in -Tariffs up to a maximum capacity of twenty megawatts (20MW)

 

Technology Tariff (US$/kWh) O&M %age 2011 2012 2013 2014 Payment Period (Years)
Hydro (9><=20 MW) 0.073 7.61% 45 MW 90MW 135MW 180MW 20
Hydro (1 ><=8MW) Linear tariff 7.24% 15MW 30MW 60MW 90MW 20
Hydro (500kW><=1MW) 0.109 7.08% 1MW 15MW 2MW 5MW 20
Bagasse 0.081 22.65% 20MW 50MW 75MW 100MW 20
Biomass 0.103 16.23% 10MW 20MW 30MW 50MW 20
Biogas 0.115 19.23% 10MW 20MW 30MW 50MW 20
Landfill gas 0.089 19.71% 10MW 20MW 30MW 50MW 20
Geothermal 0.077 4.29% 10MW 30MW 50MW 75MW 20
Solar PV 0.362 5.03% 2MW 3MW 5MW 7.5MW 20
Wind 0.124 6.34% 50MW 75MW 100MW 150MW 20

 

 

  Records 1 to 10 of 10

 

 

 

 

 

 

 

 

 